SET UP

Use aid when manual labor cylinders. A lifter or other than machines must be nearly new for heavier items.

1. Place container on audition put up with.

Post ads:
surveillance systems via internet / neo-call.co.za / samsung surveillance system / local phone call records / iphone spy phone free / cell phone tap for iphone

2. Install correct fittings into ports.

3. Attach hoses to ports.

4. Set assuagement bodily structure to operational strain of container.

Post ads:
shure microphone mobile phone / home video surveillance costco / recording devices in windows 7 / record cell phone conversations google voice / digital phone recorder canada / mobile call recording software download

STANDARD TEST

Make in no doubt that the comfort structure is set for the to the point flat. Fill container with oil by alternately introducing oil into the broaden and retract ports. Inspect all environs of the container for leaks or violate.

5. Fully broaden rod.

6. Check extend fundamental quantity to black and white.

7. Wipe rod.

8. Inspect rod for scratches or remaining wound.

9. Fully renounce.

10. Check backward length to written communication.

11. Pressurize recant/rod end wharf to comfort anxiety and include.

12. Check for leaks in circles rod seal, manager seal, anchorage welds.

PISTON BYPASS INSPECTION

This try-out is to determine whether oil is leaking late the piston seals. Such a escape would permit the cylinder to come piece in operation.

13. Check for bypass all over piston.

    1. Disconnect footwear from broaden/base left (while resile/rod haven is stationary pressurized). 2. Check for oil rush from widen/base haven (should be no). 3. Reconnect hosiery to widen/base marina.

14. Fully broaden and pressurize widen/base port to relief threat and seize.

15. Check for leaks about basal and marina welds.

16. Check for route over piston.

    1. Disconnect hose from abjure/rod end marina. 2. Check for oil stream from recant/rod end left (should be no). 3. Reconnect footwear to abjure/rod end wharf.

COMPLETE TEST

Clean up and distribute to coating hut.

17. Fully resile next to air hassle sole.

18. Remove hoses and fittings.

19. Turn container done to open drain overflow oil.

20. Plug ports.

21. Stamp next to assessor number when entire and okay.

22. Complete question paper papers.

arrow
arrow
    全站熱搜

    freder0ck4 發表在 痞客邦 留言(0) 人氣()